Internal SOP
AA Home Builders - Detailed End-to-End Process
Internal operational standard used to manage projects from first lead intake through closeout and warranty.
AA Home Builders - Detailed End-to-End Process (Internal SOP) Phase 1 - Lead Intake + Qualification 1) New Lead Intake (same day) Input: phone call / text / web lead Actions - Create a job record (Google Sheet/CRM): Name, phone, email, address, APN, lead source - Ask 8 questions: 1. What are you building? (ADU/JADU/addition/garage conversion) 2. Desired sqft? 3. Bedrooms / bathrooms? 4. Rental or family use? 5. Target start date? 6. Budget range? 7. Any HOA? Any previous plans/permits? 8. Major constraints (tight access, slope, coastal, alley access) - Request photos + short video (front, backyard, side yard, panel, water meter, gas meter, garage interior if conversion) Output: Qualified lead profile + site visit scheduled 2) Pre-Screen (10 minutes, office) Actions - Quick map check: slope hints, access street, rear alley, lot shape - Check for obvious deal-killers: no access, extreme slope, client budget unrealistic, timeline impossible - If workable: confirm site visit window Output: Go / No-go / Need more info Phase 2 - Site Visit + Feasibility 3) Site Visit (30-60 minutes) Actions (must-do photos + measurements) - Measure access width and path from street to backyard - Measure/estimate: existing structures + setbacks feel - Locate and photo: - electrical panel (rating, available space) - water meter + main shutoff - gas meter - sewer cleanout (if visible) - Check: - overhead lines - retaining walls / drainage flow - trees close to build area - garage framing condition (if conversion) - Take 30+ photos + 2-minute walkthrough video - Basic sketch with notes Output: Site visit report package (photos + notes + measurements) 4) Feasibility Report + Rough Numbers (2-5 business days) Actions - Decide recommended path: - Detached ADU vs attached vs garage conversion vs above-garage - Flag risks: - power upgrade likely? - sewer complexity? - slope / retaining? - tight staging? - coastal overlay / special review? - Create rough budget (3 buckets): - Construction range - Soft costs range (design/engineering/permits) - Unknown allowances (utility upgrades, site work, retaining) - Create rough schedule: - design (weeks) - permit review (weeks/months) - build duration (working days) Output: Feasibility Report (1-3 pages) + Proceed to Design? decision Phase 3 - Design Start (Paid) 5) Design Agreement + Retainer Collection Actions - Send design agreement (includes): - scope: concept plans -> permit set -> submission handling - deliverables list - revision limits - client responsibilities: provide survey (if needed), respond to decisions within X days - retainer amount + payment schedule - Collect retainer + start date Output: Signed design agreement + payment received + kickoff scheduled 6) Kickoff Meeting (60-90 minutes) Actions - Confirm program: - exact bed/bath count - kitchen type (full kitchen vs efficiency) - laundry needs - storage/closets - Confirm style level: - Standard / Mid / Premium (this controls pricing) - Confirm utility approach: - separate meter or shared - HVAC preference - water heater type/location - Confirm decision deadlines: - layout freeze date - finish selection freeze date - electrical/lighting freeze date Output: Kickoff notes + Design Brief (one-page summary) Phase 4 - Design Production 7) Concept Layouts (A/B) (1-2 weeks) Rules (AA quality control) - Only ONE kitchen - Bathrooms must be clearly labeled - Bedrooms must be clearly labeled + closets shown - Room sizes reasonable (no fake tiny bedrooms) - No furniture clutter unless requested Actions - Create Concept A + Concept B - Review call -> client chooses one - Capture client changes in writing Output: Client-selected concept + change notes 8) Design Development + Layout Freeze (1-3 weeks) Actions - Finalize: - doors/windows placement - plumbing stack logic (kitchen/bath back-to-back if possible) - exterior look (simple elevations) - roof direction/drainage logic - Client signs Layout Freeze (even if informal email approval) Output: Approved design direction (locked layout) Phase 5 - Engineering + Energy + Permit Set 9) Engineering Coordination (parallel, 2-4 weeks) Actions - Structural engineer: - foundation plan - shear wall schedule - framing notes/details - If needed: soils report - Title 24 / energy compliance - MEP (either full plans or performance notes depending on approach) Output: Stamped structural + energy docs + MEP info 10) Permit Set Assembly (draft -> final) Actions - Combine into one clean set: - cover sheet - site plan - floor plan - elevations - sections - details - structural sheets - energy forms - Create Permit Submittal Checklist and ensure no missing pages Output: Permit-ready PDF set 11) Internal QA (before submitting) AA No Conflict checklist - Bed/bath count matches everywhere - Kitchen count correct - Notes consistent across sheets - Dimensions consistent - Material thickness consistent (no contradictions) - Address + sheet index correct Output: Approved for submission (internal sign-off) Phase 6 - Permitting + Plan Check Management 12) Submit Permit Package Actions - Submit through City portal - Record: - submittal date - project number - reviewer name (when assigned) Output: Accepted submission confirmation 13) Plan Check Corrections Cycle Actions - When corrections arrive: - create correction log (each comment + who owns it) - respond to every line item - revise drawings and cloud changes - resubmit within 3-7 business days (goal) - Repeat until approved Output: Permit Issued + Approved stamped plans Phase 7 - Pre-Construction Setup 14) Final Contract + Schedule + Procurement Actions - Final pricing + scope - Payment schedule tied to inspections/milestones - Order long-lead items: - windows/doors - cabinets - major fixtures - Create build schedule: - start date - inspection gates - critical path items Output: Signed construction contract + schedule + procurement list 15) Site Logistics + Mobilization Plan Actions - Neighbor notice (if you do it) - Dumpster placement plan - Material staging plan - Protection plan: - driveway - landscaping - dust control - Safety plan Output: Job ready to start Phase 8 - Construction Execution (Inspection-Driven) 16) Build Sequence + Inspection Gates Typical gates - Demo (if any) - Foundation / slab / under-slab plumbing - Framing + shear - Rough electrical / plumbing / mechanical - Insulation - Drywall - Waterproofing (wet areas) - Cabinets + finishes - Final MEP trims - Final inspection Output: Passed inspections on first attempt 17) Weekly Client Update (every Friday, non-negotiable) Template - Work completed this week - Work planned next week - Inspections passed / upcoming - Decisions needed from client - 5 photos Output: Fewer disputes + more referrals 18) Change Orders (strict control) Rule: No extra work starts without written approval Each change order must include: - description - cost - schedule impact (+days) - payment terms Output: Controlled scope + protected profit Phase 9 - Closeout + Warranty 19) Punch List + Final Clean + Client Walkthrough Actions - Create punch list with due dates - Final clean - Walkthrough sign-off Output: Completion acceptance 20) Final Package + Warranty System Actions - Deliver: - final inspection approvals - warranty info - manuals/model numbers - shutoff map (water/gas/electric) - Warranty workflow: - response within 24-48 hours - scheduled warranty visits biannually (twice per year)